게시판

OEM / ODM Partnership

OEM process

OEM process

  • inquiry

  • counseling

  • contract

  • Development

  • warehousing

  • manufacture

  • delivery

ODM process

Contact us

Hadong - Head Office
(Production, R&D)

  • 50-1 Ipseok-gil, Agyang-Myeon, Hadong-Gun, Gyeongsangnam-Do 667-813, Republic of Korea

  • +82 70.4656.0891
  • +82 55.722.7225
  • jadeleetea.korea@gmail.com

Gyeonggi Office
(International Sales & Distribution)

  • F3 144, Sicheong-ro, Gwangmyeong-si, Gyeonggi-do, 14226, Republic of Korea

  • +82 10.9005.8433
  • +82 2.2688.3015
  • jadelee.kai@gmail.com

상단내용 입력 영역

Ultimate Guide to Preparing Your Yard for Synthetic Grass

Lourdes Monti
2025.09.21 09:45 5 0

본문

:
IMG_6948-9.jpg

Prior to laying synthetic grass careful base preparation is non-negotiable to ensure a long-lasting and professional result. First, eliminate all natural growth including turf, unwanted flora, root systems, and trash. Employ a turf cutter or garden spade to dig out the top layer of soil. This action stops regrowth beneath the synthetic layer and creates a debris-free foundation.


Once the area is clear, grade the surface with a landscape rake and a straightedge to identify uneven areas. Fill in depressions with compactable material like crushed stone or 熊本 人工芝 施工 gravel. Gradually reduce high points until the ground has a subtle gradient to channel runoff from structures and pathways.


Following surface uniformity, install a border or edging around the perimeter. This can utilize composite, steel, or cedar materials depending on your design.


Follow with a bedding layer of granular material about 5 to 8 cm in depth. Use a plate compactor to firmly press it down in sections. Repeat this process if needed to create a uniform, load-bearing substrate.


A top layer of premium silica sand can be laid as a finishing substrate for smoother grading and to help with drainage. Distribute it uniformly with a broom and gently tamp it down. Refrain from excessive irrigation here as it may lead to uneven compaction.


Check the surface again for levelness and make minor adjustments before proceeding.


Finally, ensure all utilities such as sprinkler lines or electrical cables are marked and protected. Restrict access to the prepared site until the turf is installed. Taking these steps carefully will reduce installation complications and maximize its long-term performance.

댓글목록 0

등록된 댓글이 없습니다.
image

Good Energy, Good People.

아시아 No.1을 넘어 세계를 향하는
Leading Company

  • 01

    에너지 펀드 가입 방법

    저희 기업에서는 에너지 펀드를 받고 있습니다.
    환경과 에너지를 생각하시는 분들을 모십니다.

  • 02

    사회공헌

    저희 기업에서는 사회공헌에 노력하고 있습니다.
    보다 좋은 세상을 위해 노력하는 기업이 되겠습니다.

  • 03

    교육 기관 견학 신청

    저희 기업에서는 교육기관 및 단체의 견학 신청을 받습니다.
    에너지의 생산과 활용 및 발전에 대해 견학해 보시기 바랍니다.

  • 04

    오시는 길

    서울특별시 목동서로 5200 하이퍼그룹 23층
    [전화번호] 02.1234.1234
    [팩스] 02.3434.3434